Content updates

This is the page for the downloads of updated content.

If assets included in the pack, or made available from this website, require updating then we will add them to this page.
 

RCH 14T tankers

These are updates for the RCH 14T tankers. This resolves a problem with the tankers not showing for users of the Settle and Carlisle route.

Wagon buffers and W irons

These are updated versions of these assets..

"Approach Target Track Mark" command

Some debug provisions in the script were left activated by mistake, and the update corrects this shortcoming.

Stoke MPD Coaling Tower

This update corrects a flaw with the termination of the wagon lift operation when the loco-coal train is under player control: when the loco is re-coupled to the emptied wagon under script control, player control is then restored but with the loco slowly continuing to move after coupling.

"Special Instructions" command

Fixed a bug where the WAIT commands will not work if the train is stationary at the point of command execution.

Staffordshire Brick and Tile Mix product

This update changes the product from a bulk load type to a container type. This makes it more suited to the included industries which use it.

Hopper ore wagon update (LMS and SIS hoppers)

This update corrects a misspecification of the queues. This has led to possible overloading of iron ore to the wagons by a factor of 2.5.

Pinnox Browhills Trip sessions (Loop Line Lite route)

This update has a small change in the driver Commands which overcomes a problem if the driver does not acknowledge a message popup at Pinnox Crossing and altered driver commands to accommodate the more effective braking that has resulted from reducing the weight of loaded coal wagons. These are the sessions for the 'Lite' version of the route.

Pinnox Browhills Trip sessions (Full Loop Line route)

This update has a small change in the driver Commands which overcomes a problem if the driver does not acknowledge a message popup at Pinnox Crossing and altered driver commands to accommodate the more effective braking that has resulted from reducing the weight of loaded coal wagons. These are the sessions for the Full version of the route.

 


 

Designed for 1024x768 or higher screen size. All original content is Copyright ©2014